To design connections, detail, procure, fabricate, treat and erect structural steelwork to form a new 2 storey extension on top of an existing 3 storey office/retail building. |
||
| Services Provided | Project Value | Completed on |
| Steelwork Production | £280,000 | 2nd April 2005 |
| Main contractor | Architect | Engineer |
| Cowlin Construction | A.D.P. | Airey and Coles |
A full survey of the existing building was required to ascertain where the new structure could connect to the existing. The new structure was erected off stubs supported on the existing roof beams.